Pumps
CMEP-OL Connecting Rods - 2 Pack
CMEP-OL Connecting Rods - 2 Pack These are replacement connecting rods for the CMEP-OL recovery pump and come in a pack of 2.
$220.00
CMEP-OL Low-Pressure Gauge
CMEP-OL Low-Pressure Gauge This is a low-pressure replacement gauge for the CMEP-OL recovery pump. Gauge readout is (-30)-0-(500)PSI.
$25.00
CMEP-OL High-Pressure Gauge
CMEP-OL High-Pressure Gauge This is a replacement High-Pressure Gauge for the CMEP-OL recovery pump. Gauge readout is: (-30)-0-(800) PSI.
$25.00
Vacuum Filter Trap
Vacuum Filter Trap This Vacuum Filter Trap is designed to remove potential contaminants from the vacuum line to prolong the lifetime of your pump. Packed with oil-free, stainless-steel SS304 wool and made with a glass jar, the filter trap may optionally be used as a low-cost cold trap. Welch Inlet / Exhaust Separator 1423B with stainless steel wool inside for even more filtration. We built out two separate fitting configurations for your convenience: just choose from the drop-down menu above! The trap ships default with two 3/8" Barbed fittings, but you may alternatively select our KF25 x 1/4" JIC fittings to receive your vacuum trap specially designed for use with our ovens! Simply clamp the trap directly onto your oven's KF25 vacuum port, then connect a 1/4" hose to your vacuum pump. Specifications: Inlet/Outlet: 3/8" FNPT (ships with adapters selected above) Jar: 230ml Glass -- Welch Inlet / Exhaust Separator 1423B Steel Wool: Oil-free SS304 Maximum Vacuum: <29"Hg Dimensions: 2.8" dia x 4.3" tall Please note this item does not include any vacuum tubing. To order, we recommend the 3/8" Gum Rubber Vacuum Tubing.
$285.00 - $295.00
BVV™ Pro Series Oil Mist Filter Replacement Cartridge
BVV™ Pro Series Oil Mist Filter Replacement Cartridge This is a replacement oil filter cartridge for the BVV™ Pro Series line of vacuum pumps. It is easily swapped out by taking off the oil mist canister from the pump and removing the clamp. The cartridges are sizes for our 5.6CFM, 11.3, and 21.2CFM pro series vacuum pumps. They prevent oil mist vapors from escaping the vacuum pump creating a cleaner air environment during operation.
$100.00 - $140.00
CMEP-OL Fan Bearing
CMEP-OL Fan Bearing This is a replacement bearing for the fan of the CMEP-OL and is fully encased and require no lubrication.
$35.00
CMEP-OL Compressor Top Cover Bearing
CMEP-OL Compressor Top Cover Bearing This is a replacement bearing for the Compressor Top Cover of the CMEP-OL and is fully encased and require no lubrication.
$45.00
CMEP-OL Valve Rebuild Kit
CMEP-OL Valve Rebuild Kit allows the user to rebuild the valves within the pump.
$45.00
UL Listed Pro Series Vacuum Pump Complete Service Kit
Pro Series Vacuum Pump Complete Service Kit This is a compelete vacuum pump service kit for the BVV™ Pro Series 5.6, 11.3, 21.2CFM line of vacuum pumps and allows the user to completely rebuild their pump and keep it running like new.
$335.00 - $385.00
MVP 6CFM 60 PSI Check Valve Replacement Kit
MVP 6CFM 60 PSI Check Valve Replacement Kit This is a replacement check valve kit for the MVP 6CFM Explosion Proof Recovery Pump. It comes with 4 replacement O-rings, 4 replacement screws and 4 replacement shims. All sales final
$80.00
BVV/CPS 1/4" FNPT Vacuum Pump Exhaust Adapter
BVV/CPS 1/4" FNPT Vacuum Pump Exhaust Adapter This fitting allows the user to connect a 1/4" NPT fitting to the exhaust for the desired application such as a carbon exhaust filter. It is made of steel and comes with a Viton O-ring.
$20.00
Mastercool 1/4" FNPT Vacuum Pump Exhaust Adapter
Mastercool 1/4" FNPT Vacuum Pump Exhaust Adapter This fitting allows the user to connect a 1/4" NPT fitting to the exhaust for the desired application such as a carbon exhaust filter. It is made of brass and comes with a Viton O-ring. This item will also fit VE115 Vacuum pumps
$10.00
Welch 2052/2054 4 Head Diaphragm Replacement Kit
Welch 2052/2054 4 Head Diaphragm Replacement Kit ***Note: This item has a possible 1-2 week lead time depending on stock availability*** Diaphragm pumps require rebuild and seal replacements.
$524.00
TRS21 Complete Connecting Rod Assembly Upgrade Kit
BVV-K1 Included in this kit: Complete connecting rod assemblies with 2-piece SS piston, piston seals, viton o-rings, and 2-piece piston tool. Looking to rebuild your TRS21 and want to upgrade to a more efficient and longer lasting piston/rod setup? This kit comes with a fully assembled connection rod and 2 piece piston. The piston is made out of SS making it a great choice for any application where bacterial growth must be eliminated. This design focuses on long life piston seal and wear band. This kit utilizes a Viton energized o-ring specifically designed for butane and or propane recovery used in the extraction process. By utilizing this kit the piston seal and wear band can be easily removed without having to disassemble the rod from crank. An inexpensive tool (*INCLUDED* SKU: BVV-TL1) is required to rebuild the seals next time service is needed. The tool uses two posts to lock into the top of the piston and a 5/8” Hex heat to remove the top part of the piston. After this has been done the wear ring can slide out and the piston seal can be replaced with a new one, the kit can be purchased for all future piston seal and wear band rebuilds (*NOT INCLUDED* SKU: BVV-3). Loctite 242 (*NOT INCLUDED*) will also be required for proper installation. A test was performed between the OEM piston and seal design and the BVV. Results show that the BVV had a much less leak rate than the OEM design. After hours of use the leak rate of the OEM design was unable to recover the complete initial solvent batch. This affects the efficiency of the recovery process.
$195.00
TRS21 / BVV Upgraded Stainless Steel 2-Piece Piston and Rod Design for Hydrocarbon Extraction
BVV-1 Included in this kit: Complete connecting rod assemblies with 2-piece SS piston, piston seals, and viton o-rings. This upgrade kit can be used for the following recovery pumps: CPS TRS21 Anti-spark/explosion pump BVV 2 Cylinder Butane Recovery Pump ITS/ETL to ANSI/ISA Certified BVV 4 Cylinder Butane Recovery Pump ITS/ETL to ANSI/ISA Certified - Requires 2 kits because this unit has 4 cylinders. Looking to rebuild your TRS21 and want to upgrade to a more efficient and longer lasting piston/rod setup? This kit comes with a fully assembled connection rod and 2 piece piston. The piston is made out of SS making it a great choice for any application where bacterial growth must be eliminated. This design focuses on long life piston seal and wear band. This kit utilizes a Viton energized o-ring specifically designed for butane and or propane recovery used in the extraction process. By utilizing this kit the piston seal and wear band can be easily removed without having to disassemble the rod from crank. An inexpensive tool (*NOT INCLUDED* SKU: BVV-TL1) is required to rebuild the seals next time service is needed. The tool uses two posts to lock into the top of the piston and a 5/8” Hex heat to remove the top part of the piston. If you would like to purchase both the piston/rod assembly and tool it’s (SKU:BVV-K1). If the tool is not used the customer is responsible for all damage done to piston. After this has been done the wear ring can slide out and the piston seal can be replaced with a new one, the kit can be purchased for all future piston seal and wear band rebuilds (*NOT INCLUDED* SKU: BVV-3). Loctite 242 (*NOT INCLUDED) will also be required for proper installation. A test was performed between the OEM piston and seal design and the BVV. Results show that the BVV had a much less leak rate than the OEM design. After hours of use the leak rate of the OEM design was unable to recover the complete initial solvent batch. This affects the efficiency of the recovery process.
$185.00
TRS21 / BVV Upgraded Top Piston Assembly
BVV-3 Included in this kit: Top piston assembly with piston seal and piston wear band. This upgrade kit can be used for the following recovery pumps: CPS TRS21 Anti-spark/explosion pump BVV 2 Cylinder Butane Recovery Pump ITS/ETL to ANSI/ISA Certified BVV 4 Cylinder Butane Recovery Pump ITS/ETL to ANSI/ISA Certified - Requires 2 kits because this unit has 4 cylinders. BVV CMEP-OL Retro Fit Upgraded Head - Requires 2 kits because this unit has 4 cylinders. BVV 4 Cyl & 2 Cyl Pump Seal Rebuild Instructions If you have upgraded to the 2-piece SS piston design this kit is used to rebuild the piston seal and wear band. Piston tool (SKU: BVV-TL1) and Loctite 242 will be needed to properly install. If tool is not used the customer is responsible for any damage done to piston during assembly.
$110.00
TRS21 Upgraded Compressor head SS ¼” SAE 45D IN and OUT fittings
BVV-9-1 Included in this kit: TRS21 compressor head SS ¼” SAE 45D IN and OUT fittings, Viton o-rings. Use these fittings to replace the OEM brass fittings on your TRS21. The SS fittings minimize and help eliminate bacterial growth in the recovery process.
$28.00
TRS21 2 Piece Piston Tool
BVV-TL1 Included: 2-piece piston tool. This tool is specially used to rebuild BVV-1. It features two posts that lock into the top of the piston and a 5/8” hex head for easy installation. This tool is required to install top piston assembly without damaging the piston. If this tool is not used the customer is responsible for all damage done to piston.
$13.00
Pump Part - MVP - 60 PSI, 150 PSI, & Liquid - Diaphragm Replacement
Pump Part - MVP - 60 PSI, 150 PSI, & Liquid - Diaphragm Replacement All sales final
$385.00 - $602.00
Pump Part - MVP - Shaft Seal Kit
Pump Part - MVP - Shaft Seal Kit All sales final
$121.50 - $418.00
Pump Part - MVP - 60 PSI, 150 PSI, & Liquid - SS&S - Fluid Plate Kit
Pump Part - MVP - 60 PSI, 150 PSI, & Liquid - SS&S - Fluid Plate Kit All sales final
$205.50
Pump Part - MVP - 60 PSI, 150 PSI, Liquid, XL150 - Diaphragm Cover Bolts - 8 pack
Pump Part - MVP - 60 PSI, 150 PSI, Liquid, XL150 - Diaphragm Cover Bolts - 8 pack All sales final
$96.25
Pump Part - MVP - 60 PSI & Liquid - Shaft Assembly Kit
Pump Part - MVP - 60 PSI & Liquid - Shaft Assembly Kit All sales final
$1,260.00
Pump Part - MVP - 60 PSI, 150 PSI, Liquid, XL150 - CO2 Regulator
Pump Part - MVP - 60 PSI, 150 PSI, Liquid, XL150 - CO2 Regulator All sales final
$389.00
Pump Part - MVP - Liquid - Stainless Steel Seat
Pump Part - MVP - Liquid - Stainless Steel Seat All sales final
$239.50
Pump Part - MVP - Liquid - Stainless Steel - Ball & O-Ring Set
Pump Part - MVP - Liquid - Stainless Steel - Ball & O-Ring Set All sales final
$249.00
Pump Part - MVP - 60 PSI & Liquid - Spider Coupler
Pump Part - MVP - 60 PSI & Liquid - Spider Coupler All sales final
$132.00
Pump Part - MVP - 150 PSI & Liquid - Stand Bracket
Pump Part - MVP - 150 PSI & Liquid - Stand Bracket All sales final
$270.50
Pump Part - MVP - 150 PSI & Liquid - Stand Legs
Pump Part - MVP - 150 PSI & Liquid - Stand Legs All sales final
$630.00
Pump Part - MVP - Liquid - Fluid Cover Kit
Pump Part - MVP - Liquid - Fluid Cover Kit All sales final
$1,360.00
$226.00
Pump Part - MVP - Liquid - Manifold Assembly Kit
Pump Part - MVP - Liquid - Manifold Assembly Kit All sales final
$1,600.00
Pump Part - MVP - Liquid - Gear Reducer
Pump Part - MVP - Liquid - Gear Reducer All sales final
$2,150.00
Pump Part - MVP - Liquid - Center Section
Pump Part - MVP - Liquid - Center Section All sales final
$1,750.00
Pump Part - MVP - Liquid - Viton Seat
Pump Part - MVP - Liquid - Viton Seat All sales final
$120.50
Pump Part - MVP - 60 PSI, 150 PSI, Liquid, XL150 - PTFE CO2 Regulator Gasket
Pump Part - MVP - 60 PSI, 150 PSI, Liquid, XL150 - PTFE CO2 Regulator Gasket All sales final
$6.00
Pump Part - MVP - 60 PSI & Liquid - Access Cover
Pump Part - MVP - 60 PSI & Liquid - Access Cover All sales final
$61.25
Pump Part - MVP - 60 PSI, 150 PSI, Liquid, XL150 - Fill/Vent Fitting Kit
Pump Part - MVP - 60 PSI, 150 PSI, Liquid, XL150 - Fill/Vent Fitting Kit All sales final
$132.20
Pump Part - MVP - 60 PSI & Liquid - Alignment Housing Kit
Pump Part - MVP - 60 PSI & Liquid - Alignment Housing Kit All sales final
$304.00
Enclosed Motor Switch Hazardous-Location - UL Listed / CSA Certified for MVP Recovery Pumps
Enclosed Motor Switch Hazardous-Location - UL Listed / CSA Certified for MVP Recovery Pumps This motor switch is designed for hazardous environments where ignitable gas and dust may be present. They're rated NEMA 7 and 9 for hazardous locations. Use them to turn motors on and off, or with other circuits such as lighting and electric heat circuits. They do not provide overload protection. This item also includes a 1" Male x 3/4" Female NPSM bushing and 1/2" Pipe nipple for steel conduit. Specifications Switch Type Motor Control Reversing Capability Nonreversing Number of Circuits Controlled 2 Electrical Phase (hp) Single (3 hp @ 240 V AC) Switch Starting Position 2 Off (Normally Open) Switch Action Stays Switched (Maintained) Industry Designation DPST-NO Switching: Current 30 A Voltage 600V AC Housing: Material Painted Aluminum Color Gray Height 6.5" Width 3" Depth 4.3" Number of Mounting Holes 2 Mounting Hole Diameter 0.31" Mounting Fasteners Included No Wire Connection Type Screw Terminals Environment Hazardous Location Environment Rating NEMA 7, NEMA 9 Specifications Met UL Listed, CSA Certified RoHS Not Compliant REACH Not Compliant DFARS Specialty Metals COTS-Exempt Country of Origin Mexico
$400.00
BVV CMEP-OL Retro Fit Upgraded Head
Disclaimer: CMEP housing and motor do not come with this upgrade kit. It only includes bolt on cylinder heads and 2 stainless steel hoses and fittings to complete the upgrade. BVV is proud to introduce the first ever Butane & Propane Recovery CMEP-OL head upgrade. Blending compact design with improved Gen III Pistons from RKMAC, this newly designed head can recover 1lb. / 1:32 Seconds! Ditch the rebuild time on the CMEP-OL and replace it with this head. Rebuilds only take 45 mins and the parts are domestically made. The piston seals are rated to 450F and the average operating temperature of the pump is 187F leading to a long service life. FEATURES AND BENEFITS Process up to 10,000 lbs. of vapor recovery before rebuild Equipped with oil-less reciprocating compressors for a clean product Designed and Assembled in the U.S.A. with domestic and global parts Affordable and highly cost efficient 4-Cylinder Configuration Equipped with Viton O-Ring Seals for Butane/Propane gas and oil compatibility Update your existing CMEP unit to a faster, more dependable unit. Noise Level: 95.3dB at 1m NOTE: If you are retrofitting a Gen 1 CMEP you will have to make a cut on the outlet pipe going from the gauge/valve to the radiator and add a compression ferrule. SKU# ISSD4BF and ISSD4FF Technical Data Sheet *Butane recovery results were achieved on a collection base pressure greater than 30psi and using a recovery cylinder with a pressure <10psi. A dry ice coil was used in between the output port of the pump and the recovery cylinder to condense vapor.
$1,250.00
BVV Complete TRS21S Gen III Upgraded Rebuild Kit
This upgraded rebuild kit contains everything you need to rebuild your TRS21 recovery pump and give a needed upgrade through improved seals, pistons, and O-rings. This upgrade kit can be used for the following recovery pump: CPS TRS21 Anti-spark/explosion pump This Kit includes the follow items: Upgraded Cylinder Replacement kit with Viton O-rings and Shims Upgraded Gen III 2 pc. SS Connecting Rod Assembly Upgraded 2 Cylinder .5" stroke Eccentric Assembly 2 pc 1/4" 45 Degree SAE stainless Steel Fittings
$415.00
Pump Rebuild Kits for 14.1 - 21.2 - 35.3 Pro Series Pumps
Pro Series Vacuum Pump Complete Service Kit This is a complete vacuum pump service kit for the BVV™ Pro Series 14.1, 21.2, 35.3CFM line of vacuum pumps and allows the user to completely rebuild their pump and keep it running like new.
$425.00 - $550.00
Koby Adapter for BVV Pumps Series
Koby Adapter for BVV Pumps Series This fitting allows the user to connect a 1/4" NPT fitting to the exhaust for the desired application such as a carbon exhaust filter. It is made of steel and comes with a Viton O-ring.
$25.00
TRS21 Upgraded Cylinder Replacement Kit, w/Shims Fits BVV4CYL & BVV2CYL
BVV-6 Included in this kit: (2x) Anodized Aluminum Cylinders and Viton Gaskets, Plus 6 shims (2x .004" and 2x .002") use for top dead center adjustment of the cylinders to dial in the displacement (recommended displacement .008"). This upgrade kit can be used for the following recovery pumps: CPS TRS21 Anti-spark/explosion pump (including the SS model from BVV) BVV 2 Cylinder Butane Recovery Pump ITS/ETL to ANSI/ISA Certified BVV 4 Cylinder Butane Recovery Pump ITS/ETL to ANSI/ISA Certified - Requires 2 kits because this unit has 4 cylinders. BVV 4 Cyl & 2 Cyl Pump Seal Rebuild Instructions
$128.00
TRS21 Valve Head Complete Viton O-ring Kit
Replacement kit with Viton O-rings for the TRS21 head. Compatible for use with the Oil Extraction Market, Butane and Propane Extraction solvents.
$32.00
CPS TRS21 Compressor Head Complete Stainless Rebuild Kit
CPS TRS21 Compressor Head Rebuild Stainless Kit Upgrade the compressor head on the TRS21 to be compatible with CBD oils by replacing all the existing O-ring seals with Viton. Replace all brass fittings with Stainless Steel to by inline with FDA on consumable products. Replace springs and valves. Compressor Head Rebuild Instructions
$99.00
TRS21 & BVV Butane Recovery Pump Valve Rebuild Kit
This is the complete valve rebuild kit for the cylinder head on the BVV Recovery pumps or the TRS21. This is only for 2 pistons. So if you have the BVV 4 Cylinder pump you would need two kits. These gaskets are upgraded and are compatible with butane and propane gasses, all the O-ring seals in this kit are Viton
$90.00
You have seen 96 out of 154 products