55 Gallon Hash Ice Water Extraction Washing Vessel
BVV Loyalty Plus has launched!
Click here to learn more.
Your Shopping Cart

It appears that your cart is currently empty!

CONTINUE SHOPPING
55 Gallon Washing Vessels Shop All Categories BVV
55 Gallon Washing Vessels Shop All Categories BVV

Manufacturer: BVV

55 Gallon Hash Ice Water Extraction Washing Vessel

SKU: 55GALWV
$1,874.00

Made in the USA

Free Ground Shipping over $420


Flat Rate Shipping On Orders Under $420!


Some exclusions may apply.
The following are excluded from this offer:
  • Item(s) that are marked "Ships Separately" on the listing.
  • Hazardous Materials (Alcohols, Lab Chemicals, Butane/Propane, and Cleaning Solvents)
  • Item(s) that BVV™️️️️ recommends ship via Freight (LTL or FTL) due to size/fragility.
  • Large orders and/or combined order weight over 100lbs ship via Freight (LTL or FTL)
  • Free ground shipping only applies to the lower 48 states

Ships Separately

You will earn 0 points for this purchase.


Price Match

BVV's 55 Gallon Ice Water Extraction Washing Vessel

Made in USA

Designed with durability and ease of use in mind our Ice Water Extraction Washing Vessels are manufactured from 16 gauge 304 stainless steel crafted with seamless welds for a 100% sanitary construction. Our easy drain barrels come complete with  4X 1.5" Triclamp drains mounted as low as possible for effortless draining of its 55-gallon volume capacity. Perfect for medium to large-scale ice water extraction labs this stand-alone vessel pairs nicely with Boldtbags Large Open Top Wash Bags & Boldt bags 44 gallon Lock-top Full Mesh Stackers.

Processing Power

  • Material Capacity Per Batch: 20-30LB
  • Water Capacity: 55 Gallons
  • Cycle Time: 60-90 Minutes
  • Daily Extraction Capacity: Up to 60 lb, per 8-hour shift

Specifications

  • 23"x36" 55-gallon Stainless Steel Washing Vessel
  • Seamless 304 Stainless Steel Construction
  • 4X 1.5" Tri-clamp ports for draining, filling, temperature sensing, or sight glasses
Performance
  • Low-mounted drain ports for complete draining